激情偷拍av-怡红院亚洲第一综合久久-亚洲成av人在线观看天堂无码-国产精品20p-亚洲日韩a∨无码久-国产午夜三级-韩国av免费在线观看-欧美黑人极品猛少妇色xxxxx-久久九九视频-亚洲人成网站在线无码-国产乱淫精品一区二区三区毛片-蜜桃少妇av久久久久久久-久久久综合精品-日韩午夜在线-丁香激情综合久久伊人久久-午夜性福利视频-无线乱码一二三区免费看-久久九九热视频-国内精品久久久久久久影视麻豆-国产伦精品一区二区三区妓女下载

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site