激情偷拍av-怡红院亚洲第一综合久久-亚洲成av人在线观看天堂无码-国产精品20p-亚洲日韩a∨无码久-国产午夜三级-韩国av免费在线观看-欧美黑人极品猛少妇色xxxxx-久久九九视频-亚洲人成网站在线无码-国产乱淫精品一区二区三区毛片-蜜桃少妇av久久久久久久-久久久综合精品-日韩午夜在线-丁香激情综合久久伊人久久-午夜性福利视频-无线乱码一二三区免费看-久久九九热视频-国内精品久久久久久久影视麻豆-国产伦精品一区二区三区妓女下载

News

RIH Dual Tubing Project in Ecuador

Date 2009-09-28

MARIANN- 24 well, Hilong dual tubing project, is located in TARAPOA area of Ecuador. The artificial bottom hole of MARIANN- 24 is 9367ft depth, and its two target layers are each located at 7141.39ft and 7376.77ft depth. The client has requested the operation at both layer to be carried out simultaneously. Since this is the first time for Hilong to operate the dual tubing project, every one of HILONG-3 fells the great pressure of this challenge. The success of dual tubing project has doubled output of MARIANN- 24 well; from 1000 barrels per day to 2000 barrels per day.


In order to perform the dual tubing project, HILONG-3 has introduced the advanced device,dual tubing hydraulic tongs (with torque gauge and recording indicator), dual tubing air spider and slip and dual tubing air spider elevator. In addition, HILONG-3 has also cooperated with the top oil service companies, Schlumberger and Weatherford, for the technology aspects.


This project started at 16:00 of September 12 and finished at September 30. It only took 18 days for HILONG-3 to reach the 7141.38ft and 7376.77ft depth.


The Ecuador client had great feedback about dual tubing project of HILONG-3. This is also the landmark for Hilong in the international market.