激情偷拍av-怡红院亚洲第一综合久久-亚洲成av人在线观看天堂无码-国产精品20p-亚洲日韩a∨无码久-国产午夜三级-韩国av免费在线观看-欧美黑人极品猛少妇色xxxxx-久久九九视频-亚洲人成网站在线无码-国产乱淫精品一区二区三区毛片-蜜桃少妇av久久久久久久-久久久综合精品-日韩午夜在线-丁香激情综合久久伊人久久-午夜性福利视频-无线乱码一二三区免费看-久久九九热视频-国内精品久久久久久久影视麻豆-国产伦精品一区二区三区妓女下载

News

Hilong Visits South China Sea to Inspect Flammable Ice Project

Date 2017-07-06

(July 6, 2017, Shanghai) On June 30, 2017, Hilong President Zhang Jun, Executive President Wang Tao, and their entourage went to the Shenhu Area of the South China Sea to inspect the flammable ice project.


During the inspection, Hilong, China Geological Survey (CGS), the owner of the flammable ice mining project, and general contractor CNPC Offshore Engineering Company Limited held an in-depth discussion on the cooperation of flammable ice development equipment, technical services, and other aspects.


The Hilong inspection team also listened to CNPC Offshore Engineering Company’s special presentation on flammable ice mining technology and had a field visit to understand the drilling technology and equipment of “Blue Whale No. 1”, the world’s largest offshore drilling platform.

 

Hilong President Zhang Jun noted that Hilong has been committed to providing the world’s leading equipment and service for energy development and actively explores technology development directions of new energy. Mr. Zhang also noted that “this inspection will lay a solid foundation for Hilong’s development of equipment and technical services in the flammable ice development field”.


According to a report from Xinhua News Agency Beijing as of June 21, China has been conducting trial mining of flammable ice in the South China Sea for up to six weeks, with cumulative output of over 230,000 cubic meters. During this time, China’s flammable ice trial mining works achieved breakthroughs beyond expectations despite Typhoon Merbok. Trial mining in the Shenhu Area of the South China Sea has been organized by CGS. 

 

Flammable ice, namely, natural gas hydrate, appears like ice but contains 80%-99.9% methane which is flammable. It is considered one of the best alternative sources of energy for the future of mankind. Burning 1 cubic meter of flammable ice can release 164 cubic meters of methane gas. 

Group Photo of Hilong Inspection Team and Relevant Leadership of CGS and CNPC Offshore Engineering Company Limited on the “Blue Whale No. 1” Drilling Platform